In order to realize intelligent and digital management, China Feihe Ltd., laid out intelligent factories and built intelligent industrial park projects, which effectively promoted the deep integration of digital intelligence and the whole dairy industry chain. The project covers an area of 362,000 square meters, including an infant milk powder factory with a total annual output of 70,000 tons, a functional raw material production line, an intelligent logistics center, a world-leading R&D center and an innovation testing center.
ZOZEN gas-fired boiler enables Feihe Intelligent Industrial Park to realize intelligent heat supply
Feihe will carry out industrial tourism in the Intelligent Industrial Park. At that time, the pasture environment, production process and boiler room will also be fully open to users. As a gas-fired boiler supplier, ZOZEN Boiler ensures the standardization and safety of the boiler room from the aspects of boiler quality, system configuration and intelligent control, and builds the first visitable boiler room.
The boiler body of this project adopts ZOZEN SZS series 10 ton 2.5 mpa steam boiler, and the furnace is equipped with steam-water separation, which makes the boiler has low steam water content and is conducive to the full utilization of heat energy. Also, the sufficient steam output and strong load capacity ensures the long-term operation, which meets the heating demand of the production line. In addition, the condenser and chimney are made of stainless steel, which is not only beautiful, but also has strong corrosion resistance and long service life.
The stainless steel outer package of ZOZEN supporting system of boiler is beautiful and practical
Elco burner is used in the natural gas fired boiler combustion system, which ensures sufficient burning of the fuel, simplifing all the installation and maintenance activities. The valves are the famous brand - ARI-Armaturen.
The boiler system of the gas-fired boiler
We started the boiler project smoothly, however, due to the COVID-19 pandemic, the installation was difficult during that time. To ensure the installation progress and quality, ZOZEN project manager hired the local professional installers, and coordinated on the spot to ensure the normal work.